Saturday, September 6, 2008
Walls up to Basement Ceiling
The walls are stacked, the windows are framed and then braced up and down and side to side. The frames will be used to attach the windows later on. The braces are only there during the cement pour, so that the weight does not warp the frames in or down. The cement gets pumped fast and furious. It was all Brent could do to keep it under control so it went in the walls.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment