The sides where the daylight basement is has a foundation 4 feet below the
level of the basement. The sides where there will only be high basement
windows only has foundation to just below the basement floor. At the end of
this first cement pour the foundation was all at one hight about two feet
above the basement floor and we could really see the full outline of the
octagon. After the stumps were pulled out of the field it was just dirt and
dust. Brent seeded it with clover and timothy (a grass) that will hold the
soil and add nutients. The day after the cement, the outside of the
styrofoam got sealed with a very sticky thick contact paper, and the trench
got backfilled with dirt.
Thursday, August 14, 2008