Sunday, August 10, 2008

Foundation Hole and Footings

Footings filled with cement as base for first layer of Styrofoam blocks. The
blocks are put together like leggos, with spaces framed out for doors and
windows. Cement is poured down the space between the Styrofoam, prepped with
re-bar. The foundation, insulation completed and ready for interior and
exterior siding. Very green, very energy efficient.

No comments: